ACCESSORY DWELLING PLANNING CHECKLIST Use a project reference. Keep private resident, medical and financial records in the appropriate protected file. Record answers, sources and unresolved items. This organizer is not a permit, approved plan, inspection, medical-care plan or investment recommendation. Project reference: Date checked: Responsible project reviewer: 1. DWELLING AND GOALS Actual structure classification and intended use: Resident-led housing, privacy, location and support preferences: Alternative housing arrangement to compare: Separate care or support responsibilities, availability and cost: 2. AUTHORITY AND APPROVALS Responsible state/local authorities and current written requirements: Site, design, use, rental-term and association-law questions: Required plans, permits, inspections and occupancy approval: Water, drainage, sewer/septic, energy and other connection review: Unresolved condition, responsible person and next step: 3. BUILD OPTION New construction, conversion or exact factory-built classification: Complete scope; site, foundation, delivery and installation responsibilities: Excluded work, qualifications, approvals, changes and warranty: Resident access review and required modifications: Actual technology functions, consent, privacy, response and outage plans: 4. COST List each amount with its quote/source date and included scope. Design, surveys and professional review: Site preparation and foundation: Unit/construction and alterations: Transport, lifting equipment and installation: Utility connections and site restoration: Permits, inspections and required access work: Contingency and schedule assumptions: Recurring maintenance, utilities, insurance, taxes and financing: Separate optional care, support and technology charges: Verified assistance, eligibility and covered costs: For a rental: current rent evidence, vacancy and operating-cost assumptions: Cost-overrun or lower-income scenario and alternative arrangement: 5. TENANCY AND COMPLETION Verified listing features and lawful application-review process: Agreement, occupants, shared areas, utilities, access and maintenance: Final required approvals and condition record: Completed repairs, keys, alarms and operating instructions: Resident confirmation of agreed usable features: Records saved, outstanding work and follow-up date: A product label, cost estimate or completed delivery does not establish approval to occupy, accessibility, staffed care or a guaranteed financial result.